![]() | Home > Maintenance & Modifications > Foot well replacement (Driver side) RHD Defender 110 97 |
![]() ![]() |
|
|
LandRoverAnorak Member Since: 17 Jul 2011 Location: Surrey Posts: 11324 ![]() ![]() |
It's an integral welded part of the bulkhead. Darren
110 USW BUILD THREAD - EXPEDITION TRAILER - 200tdi 90 BUILD THREAD - SANKEY TRAILER - IG@landroveranorak "You came in that thing? You're braver than I thought!" - Princess Leia |
||
![]() |
|
defender9 Member Since: 12 Mar 2016 Location: Fylde Coast Posts: 1629 ![]() ![]() ![]() |
If still the original footwell then I think it will be spot welded in, if so and you can still see the spot welds buy a spot weld drill bit.
|
||
![]() |
|
itolond Member Since: 16 Jan 2016 Location: Singapore Posts: 193 ![]() ![]() ![]() |
Ok got it its a cut out situation.
given responses- i am guessing a riveted installation is ok ( sealed of course) |
||
![]() |
|
Retroanaconda Member Since: 04 Jan 2012 Location: Scotland Posts: 2698 ![]() ![]() |
No, it will need to be welded. The pedal boxes and steering all attach to it and so it needs to be rock solid.
Cut out the old one, then seam-weld in a replacement. |
||
![]() |
|
![]() ![]() |
|
All times are GMT |
< Previous Topic | Next Topic > |
Posting Rules
|
Site Copyright © 2006-2025 Futuranet Ltd & Martin Lewis
