![]() | Home > Off Topic > 7n concrete Block is there an alternative? |
![]() ![]() |
|
|
stew 46 Member Since: 26 Jan 2012 Location: Wadebridge ,cornwall . Posts: 561 ![]() ![]() ![]() |
Work is the work shop made of ?
Stew |
||
![]() |
|
Ads90 Member Since: 16 Jun 2008 Location: Cots-on-the-Wolds Posts: 812 ![]() ![]() ![]() |
I understand your concern re. appearance, but in my experience the concrete will weather down & look fairly natural grey under a weathered timber (utility) building... I'm assuming it is just a single block high?
If you render it, it will draw your eye even more. Plenty of bricks are strong enough, but drilling fixings for the sole plate is trickier, and individual bricks are displaced from their mortar easier. I've probably got pics of larch-clad buildings on a course of concrete blocks if you want to see an example? For a higher status building (like a dwelling), a brick plinth would usually cover the blockwork inner. |
||
![]() |
|
GREENI Member Since: 22 Aug 2010 Location: staffs Posts: 10383 ![]() ![]() |
...and who is the supplier, please? I'm looking for a workshop (if it's wooden).
|
||
![]() |
|
ibexman Member Since: 13 Dec 2008 Location: Essex Posts: 2957 ![]() ![]() |
You could shutter and pour concrete. To the same dimensions
|
||
![]() |
|
Stacey007 Member Since: 25 Sep 2015 Location: Cheshire Posts: 3797 ![]() ![]() |
Hello
Sorry I did mean to say its a wooden building that will sit on top and yes just one course high. The way it will be fitting it will be on show at the front of the building and one side.. I understand the issues with normal bricks... hence why this company want to use these I guess. If you can attach a picture that would be good, I will have a quick look online. Thanks |
||
![]() |
|
Stacey007 Member Since: 25 Sep 2015 Location: Cheshire Posts: 3797 ![]() ![]() |
I Guess it will look like this only 1 course high
![]() Just not 'as' pretty as normal bricks... from the boss's point of view ![]() |
||
![]() |
|
ibexman Member Since: 13 Dec 2008 Location: Essex Posts: 2957 ![]() ![]() |
You could clad it with same material as building
|
||
![]() |
|
Ads90 Member Since: 16 Jun 2008 Location: Cots-on-the-Wolds Posts: 812 ![]() ![]() ![]() |
You don't really want any timber lower than 150mm above ground level - it will be more prone to rot.
Here's a few pics of timber frame garages I have worked on with concrete block below sole plate: ![]() Click image to enlarge ![]() Click image to enlarge ![]() Click image to enlarge If it is prominent and you are not convinced, I'm sure you could use a frog-less brick, or even clad with brick slips. |
||
![]() |
|
stew 46 Member Since: 26 Jan 2012 Location: Wadebridge ,cornwall . Posts: 561 ![]() ![]() ![]() |
There frame work ( should ) sit flush with the out side of the block work on a DPC and your cladding should come down past the block work by at least 50 MM , it’s better if the inside edge of the cladding that oversails past a top of the block work is 10-15 of the face of the block work as that’s a wet wall .
Stew |
||
![]() |
|
stew 46 Member Since: 26 Jan 2012 Location: Wadebridge ,cornwall . Posts: 561 ![]() ![]() ![]() |
![]() Click image to enlarge |
||
![]() |
|
Retroanaconda Member Since: 04 Jan 2012 Location: Scotland Posts: 2703 ![]() ![]() |
I used engineering bricks when I built mine. Two courses high and then the walls sit on top. The wall straps then came down the inside and fixed to the concrete slab rather than the brickwork. Avoids drilling the bricks and also no need to breach the DPC.
|
||
![]() |
|
Rashers Member Since: 21 Jun 2015 Location: Norfolk Posts: 3566 ![]() ![]() ![]() |
I bet the engineering bricks look fantastic Retroanaconda
![]() You can get a concrete block which has a smoother finish (like what they use for internal walls withing buildings, where there is no dry wall or plaster). They look quite nice when pointed up. Used a lot in commercial properties and popular as a heat sink in eco-houses. Like you, I have had a Google and I can't find anything from the big builders merchants. Those blocks do look a bit stark and unfinished when they are new. As has been said, they do weather and as I have just found, mortar sticks to them like sh** to a blanket (been doing some demolition work on s mall wall I put up about 25 years ago). I think I would look at building in brick instead of block. Will cost a bit more. I hope you have a good supply of wood. I have heard some tales of shiplap being like rocking horse poo in some areas as we all take to home working and everyone wants a home office in the garden. One of my colleagues got given an 8 month lead time for a garden shed ![]() Covid is obviously doing some companies the world of good. |
||
![]() |
|
the gamekeeper Member Since: 01 Jan 2010 Location: Surrey Posts: 96 ![]() ![]() ![]() |
An engineering brick will have the same strength for loading, if it is for facing a clay brick could be used DPC will need to be used, a timber frame structure would need to be a minimum of 150mm from finished ground level. Allow the timber cladding to protrude past the DPC joint. Make sure the frogs in the bricks are fully filled and even use strapping to hold down the timber frame or shot fire a timber sole plate to the brickwork.
|
||
![]() |
|
Stacey007 Member Since: 25 Sep 2015 Location: Cheshire Posts: 3797 ![]() ![]() |
Thanks all
Some good information and advice ![]() My delivery is scheduled for February... everyone is snowed under with work. However I have a fair bit to sort I may start a garage build thread ![]() |
||
![]() |
|
![]() ![]() |
|