Member Since: 07 Jan 2018
Location: London
Posts: 562
Lockdown project #102
Had the rings for a while, finally painted and installed, the plastic rings are really cheap and nasty, also managed to finally remove the dead bug that had got in from the back.
Click image to enlarge
The nasty alloy sills were all scratched and rusty, replaced with these beauts, stainless, powered coast, and added a very think layer of art plastic sheeting behind the backs to make he letters pop £1 off eBay, cut and taped to the back, sealed with silicone and in they go.
Click image to enlarge
Breaks up the black interior.
Next job, fix the broken passenger side plastic door release lever, been rattling around for a while.with a more solid and quality billets item, c’mon Mr DHL driver, get cracking.
After that, fitting a RR P38 interior light panel to replace the Mudstuff. panel... the wiring, exactly the same, plug and play, and upgrade the bulbs to LED’s, they are in the post.... it’s been sprayed black and will go in the Corsetti panel and provide individual LED side to side lighting.... will complete next week
These lockdowns are excellent for getting things done.
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot edit your posts in this forum You cannot delete your posts in this forum You cannot vote in polls in this forum